Whitmore Primary School

Phase 1 rewire of a key stage two building. The complete electrical installation was stripped out and replaced including mains switch gear and distribution boards. 

 A small power installation was installed including suspended ceiling, low energy LED lighting with absence and presence detection. 

 Works were completed inside and outside of term time with minimal disruption to the school.

Client: Berlersdoona Academy Trust

Project Location: Whitmore Way, Basildon, Essex

Project Cost: £290,000