Phase 2 Rewire of various zones in a secondary school including Science Lab Refurbishment.

The complete electrical installation was stripped out and replaced including mains switch gear and distribution boards.  

A small power installation was installed including suspended ceiling, low energy LED lighting with absence and presence detection. 

Works were completed inside and outside of term time with minimal disruption to the school.

Client: Ortu Hassenbrook Academy

Project Location: Hassenbrook Rd, Stanford-le-Hope, Essex

Project Cost: £912,000